Bitumen and Bituminous Mixtures

Wed, 09/17/2014 - 08:49 -- Anonymous (not verified)

4.00

 

Bitumen and bituminous mixtures

 

4.01

Ring and ball

148.00

4.02

Penetration

157.00

4.03

Layer thickness (per core)

40.00

4.04

Separation of layers (per layer)

40.00

4.05

Preparation of Marshall samples (per sample)

58.00

4.06

Apparent density of samples

155.00

4.07

Bulk density of samples (3 samples)

155.00

4.08

Marshall-stability and flow (3 samples)

170.00