Road Pavements, Concrete and Artificial Stones

Wed, 09/17/2014 - 08:52 -- Anonymous (not verified)

Number

 

Type of Service

Rate (N$)

 

 

 

 

 

 

5.00

 

Road pavements

 

 

5.01

Benkelman Beam (per point)

190.00

 

(plus variable payment)

 

 

 

 

6.00

 

Concrete and artificial stones

 

 

6.01

Dimensions (cubes, beams etc), per sample

2.00

6.02

Weight, per sample

2.00

6.03

Capping, per sample

50.00

6.04

Forming of samples

35.00

6.05

Curing

10.00

6.06

Air content (fresh concrete)

x)

6.07

Compressive strength, per sample

26.00

6.08

Bending strength

26.00

6.09

Compressometer (strain characteristics)

120.00

6.10

Consistency

x)

6.10.1

Slump

x)

6.10.2

Flow table

x)

6.10.3

Consistency container

x)

6.11

Rebound hammer (acc. to Schmidt)

x)

6.11.1

Laboratory, per test value

26.00

6.11.2

Building

x)

6.12

Sampling of fresh concrete

 

6.12.1

Call-out fee (Windhoek)

                      250.00
6.12.2 Standing time (per hour)                       100.00

                 ix) Prime costs acc. to chapter 3